Lift and Shift of a Volume from Source to Target
Once Lift and Shift Settings have been configured, it is time to configure the volume for transition to the target node. The Lift and Shift Process is broken up into 5 key steps. To begin these steps, select Lift and Shift from the Storage Administration pane.
Step 1 - Naming the Data Flow
In older versions of SoftNAS , an additional step might be required: selecting the platform. If this appears, you would select the platform you are running: Microsoft Azure, Amazon Web Services, or VMware.
Step 2 - Enter Node information
If the login fails after selecting Next, the credentials for the “cloud connection” need to be checked.
This process will take several minutes so be patient. If the process takes over 5 minutes without completing, it is a good idea to double-check your 9443 and 8081 firewall or security group settings for both the Source and Target and make sure they are correct.
Once the setup of FlexFiles on the Target is complete, and FlexFiles is restarted successfully, you will automatically be transferred to Step 4.
Step 4 - Configure Volumes
Next, you will specify the volumes to be "lifted" as well as the target to which the volumes will be "shifted". This can be done either by using the "Create Target Storage Wizard" or the "Advanced Configuration Wizard".
The Create Target Storage Wizard handles the configuration details of the disk devices, storage pools and volumes being "shifted" to.
The Advanced Configuration Wizard allows you to determine the specific details regarding the disk devices, storage pools and volumes being "shifted" to.
Using an External File Server
If using the "Create target storage wizard"
If using the "Advanced configuration wizard"
You can also use the advanced configuration wizard to configure your target storage. The advanced configuration method allows you more granular control of the pools and volumes created, as well as how they are labelled.
Enter in the size of the disk(s) and number you want to create on the Target.
Step 5 - Configure (Map) Source to Target
Having specified the pools and volumes to be shifted, and configured the target node to receive the data, it is now time to verify the operation is properly configured.
If properly configured, you will see "passed" in the status column.